WTS performed the large component piping segmentation at Maine Yankee.
This included cutting pipe, 39.5” O.D. x 3” wall thickness with a minimum of .125” stainless steel cladding, to remove the loop isolation valves and the reactor coolant pumps. The remaining reactor coolant piping was also cut free and removed. |